Commercial

Line Pump Concrete Slab Sectional Factory Flooring Case Study

Client

Factory Operator

Location

Basingstoke, Hampshire

Service

45m Line Pump of 4m³ C35 Structural Concrete

Duration

2.5 Hours

Project Overview

When a busy factory in Basingstoke needed a new section of internal flooring, 2 Brothers Concrete & Pumping was ready to lay the groundwork. The brief sounded simple but needed real care to deliver: place a high-quality concrete slab inside a working building without causing any operational downtime.

We were booked to line pump 4m³ of C35 ready-mix concrete, a structural design mix built for strength and durability under heavy factory traffic. This was the first of several phased pours at the site, and a great example of how commercial concrete pumping in Hampshire helps manufacturers upgrade their premises while keeping production on track.

No Room For Downtime

Factories don’t like to stand still. With machinery, staff and deliveries all relying on the floor space, closing the building for a big pour simply wasn’t an option. Instead, the new floor had to be laid in small, manageable sections over a series of separate pours, each one planned so production could carry on around it.

Timing was everything. To keep the factory fully operational, we carried out the pour on a Saturday morning. That gave the concrete time to set over the weekend, so the area was ready for work again on Monday, the next working day.

Quality mattered just as much as speed. The client’s own team would be carrying out a power float finish once we’d placed the concrete, so the slab had to be laid to the highest standard of smoothness and level. A well-placed pour makes for a better final finish, and a better final finish makes for a factory floor that lasts.

What We Did

The Right Pump For The Job

For this industrial concrete pour, we used our 45m line pump. A line pump pushes concrete through a flexible hose, so we could run the line from outside the building right to the pour area. That meant no ready-mix lorries inside the factory, no barrows trundling across the floor and no mess left behind in a working space.

Line pumping concrete inside a building also gives our operator precise control over where each load lands. On a phased factory slab, that accuracy helps every new section meet the last one neatly.

A Mix Built For Heavy Duty

Factory floors take a lot of punishment from forklifts, pallet trucks and heavy machinery. That’s why the specification called for C35, a structural concrete design mix that delivers high compressive strength and long-term durability. If you’d like to know more about how mixes are graded, take a look at our guide on concrete strength classes.

Saturday Morning, Sorted

Liam was our sole operator on the day, handling the pump set-up, the pour and the clean-down himself. He kept the hose moving steadily and placed all 4m³ of concrete evenly across the section, giving the client’s team the smooth, consistent base they needed to start power floating straight away.

From arrival to finish, the whole job took just 2.5 hours. The site was left clean and tidy, with the new slab setting nicely ahead of Monday morning.

Results

The first section of the new factory floor was poured, finished and left to cure, with zero disruption to the working week. Production picked up on Monday exactly as planned, and the client’s team had a high-quality structural slab ready for its power float finish.

This was the first of several pours at the site, and we’re looking forward to heading back to Basingstoke to help complete the rest of the floor, one carefully planned section at a time.

Project Highlights

  • Location: Factory in Basingstoke, Hampshire
  • Scope: Line pumping a new section of internal factory flooring
  • Pump: 45m line pump
  • Volume: 4m³ of C35 structural design mix concrete
  • Duration: 2.5 hours on site
  • Operator: Liam (sole operator)
  • Timing: Saturday morning pour, ready for Monday operations
  • Finish: Laid for a power float finish by the client’s team
  • First of several phased pours, with zero operational downtime

Why Choose 2 Brothers Concrete & Pumping?

Working buildings come with tight timeframes, strict site rules and very little spare room, and that’s exactly where our team shines. Our CPA and CPCS accredited operators and modern fleet of vehicles handle everything from small structural pours to large-scale commercial projects, always planned around your operation. Find out more about our concrete pumping for factories, warehouses and energy sites on our industrial, logistics and energy page.

We provide concrete pumping in Basingstoke, across Hampshire, and throughout the South of England. From secure naval sites to community skateparks, we bring the same care to every pour.

Get In Touch

Planning a new factory floor, warehouse slab or industrial pour? Whether you need concrete pumping in Basingstoke or anywhere else in Hampshire and the surrounding counties, 2 Brothers Concrete & Pumping has you covered.

Call us on 01489 552737 or fill in our contact form for a free, no-obligation quote. We’ll work around your schedule, so your business doesn’t have to stop.

- Concrete Calculator

How much
concrete do
you need?

Use our free calculator to estimate volume - then get in touch for a tailored quote and on-site delivery slot.

Ready to order?

EST — VOLUME
Volume required
2.25

Estimates only. Final quote depends on access, mix specification and pour method.

Get Free a Quote

Simply fill out the form and we'll get in touch to discuss your quote.

GDPR*