South Western Rail – Winchester

Project Overview

On 12th August 2025, 2 Brothers Concrete & Pumping was subcontracted to carry out a concrete pumping job for South Western Rail at a site in Winchester, Hampshire.

The project required precision planning and specialist equipment due to the restricted site access and tight working conditions surrounding the rail infrastructure.

To overcome these challenges, our team deployed a long line pump setup, using 180 metres of pipeline to deliver 9m³ of concrete efficiently and safely. Despite the demanding layout, the pour was completed in under 3.5 hours, ensuring the schedule remained on track and disruption to surrounding works was minimal.

2 Brothers in Winchester for South Western Rail
2 Brothers Concrete South Western Rail Project

Challenges

Railway sites often present limited access and strict safety protocols, so careful preparation and communication with the main contractor were essential.

The concrete had to be pumped over a long distance through narrow access routes, requiring precise coordination between the pump operator, ground crew, and site manager.

Our experienced team assessed the setup in advance, ensuring the correct line pump configuration was in place and the mix design was suitable for the distance and pressure required.

Our Solution

We utilised our specialist concrete line pump – ideal for tight sites, urban projects, and restricted access jobs. The 180m pipeline was laid and tested before the pour to guarantee smooth flow and consistent delivery.

Communication was key: our operators maintained radio contact throughout the job, ensuring a steady and controlled pour rate, achieving the required finish without any downtime or blockages.

The end result was a clean, precise concrete pour delivered safely, on time, and within budget – a testament to the professionalism and reliability that 2 Brothers are known for across the South of England.

2 Brothers Concrete in Winchester
2 Brothers Concrete Pumping Truck Winchester

Client Feedback

South Western Rail was extremely pleased with the efficiency and professionalism of the 2 Brothers team. They noted how well the crew handled the logistical challenges of the long-distance pump setup, praising the communication and coordination on site.

They explained that the pour went exactly to plan and that the team’s punctuality, problem-solving attitude, and attention to detail helped them keep their wider project on schedule.

Our end client said it was clear why 2 Brothers come so highly recommended, adding that nothing was too much trouble, and the job was done right first time.

This mirrors the type of feedback 2 Brothers consistently receive from clients across the South – described in Google reviews as “professional, efficient, tidy, and always reliable.”

Results

  • 9m³ of concrete pumped
  • 180m of pipeline
  • Job completed in under 3.5 hours
  • Completed safely and on time
  • Client satisfied and willing to recommend
2 Brothers Truck in Winchester for South Western Rail
2 Brothers Concrete Truck South Western Rail Project

Conclusion

This project demonstrates how 2 Brothers Concrete & Pumping continue to deliver reliable, professional, and efficient concrete pumping services across the South of England – even in complex and challenging environments such as rail infrastructure sites.

Whether you need domestic concrete pumping for a driveway or foundation, or commercial concrete pumping for large-scale developments and civil engineering projects, our experienced team can help.

Get in touch today to discuss your project – no matter the size or complexity, we’ll get the job done quickly, cleanly, and professionally.

Feel free to give us a call on 01489 552737 to discuss your next concrete pumping project.

Concrete Project in Winchester for South Western Rail
2 Brothers Concrete Pipeline for SWR in Winchester
2 Brothers in Winchester
South Western Rail Concrete Project Pipeline
Concrete Pipeline to South Western Rail Project
2 Brothers Concrete 180m of Pipeline
2 Brothers Concrete Pipeline
2 Brothers Concrete Pipeline End
Case Studies
New Build – Salisbury, Wiltshire
New Apartment Development – Southsea, Portsmouth
Shed Base – Gosport, Hampshire
Lidl – Havant, Hampshire
South Western Rail – Winchester
Rose Bowl Southampton
Gunwharf Portsmouth

Contact Us today for expert advice

A member of our team will be in contact with you shortly.

Concrete Calculator

Footing Volume

Calculate

You need:

 m3

Contact Us:   01489 552737

Google Rating
5
Based on +85 reviews